The map will be used for design works of the future high-speed line Brno-Ostrava.
A technically and surveying-wise challenging project on an electrical transmission system in rugged terrain.
A technically and surveying-wise challenging project on an electrical transmission system in rugged terrain.
At the end of May, we met again outside the office, at the Brdy Věšín Campground.
At the end of May, we met again outside the office, at the Brdy Věšín Campground.
Our company has once again joined this year’s May challenge, “Cycle, Walk, or Jog to Work.”
Our company has once again joined this year’s May challenge, “Cycle, Walk, or Jog to Work.”
The map will be used for design works of the future high-speed line Brno-Ostrava.
Interested? Drop us an email, or give us a call. We would be delighted to hear from you.